Axminster
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-d8b730d7701a144507979aba |
| MW Increase / Decrease | 120 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-d8b730d7701a144507979aba |
| Cumulative Total Capacity (MW) | 120 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-d8b730d7701a144507979aba |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Axminster |
| Customer Name | HB825AXM LTD |
| Connection Site | Axminster 132kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 120.00 |
| Cumulative Total Capacity (MW) | 120.00 |
| MW Effective From | 2024-10-31 |
| Project Status | Awaiting Consents |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005ixvQAA |
| Project Number | PRO-001017 |
| Gate | 1 |
| Original text | Awaiting Consents |
| source_record_id | csv:row:97 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:97
Sources EV-d8b730d7701a144507979abaEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bc64430af621e7e054a69d50d8c3297424e8e93eca57ada103c13b427e31b112
Usage terms NESO Open Data Licence