Alcemi Armadale BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-34abedfec00afbd825b34e58 |
| MW Increase / Decrease | 280 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-34abedfec00afbd825b34e58 |
| Cumulative Total Capacity (MW) | 280 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-34abedfec00afbd825b34e58 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Alcemi Armadale BESS |
| Customer Name | ALCEMI STORAGE DEVELOPMENTS 8 LTD |
| Connection Site | Whitburn 400kV substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 280.00 |
| Cumulative Total Capacity (MW) | 280.00 |
| MW Effective From | 2030-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SPT |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000f7gRAAQ |
| Project Number | PRO-004011 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:44 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:44
Sources EV-34abedfec00afbd825b34e58Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 7fc7cc6c25abc7ece1d0f10f3f2b7d1280de525a84e933635886355641a16624
Usage terms NESO Open Data Licence