Beauly 02 BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-180cd865ef71ed9d252da321 |
| MW Increase / Decrease | 100 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-180cd865ef71ed9d252da321 |
| Cumulative Total Capacity (MW) | 100 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-180cd865ef71ed9d252da321 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Beauly 02 BESS |
| Customer Name | FIELD BEAULY LTD |
| Connection Site | BEAULY 02 BESS 132kV SUBSTATION |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 100.00 |
| Cumulative Total Capacity (MW) | 100.00 |
| MW Effective From | 2028-12-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000000exTqAAI |
| Project Number | PRO-003731 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:139 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:139
Sources EV-180cd865ef71ed9d252da321Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c1f6297202d49795a6e881ba19f66d9d60d51b39cd37d65cfa5d2b3575894ce1
Usage terms NESO Open Data Licence