Bad a Cheo Wind Farm
Connection register · built
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 26.65 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-4b7e15f46ac3c91050e689da |
| MW Increase / Decrease | 0 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-4b7e15f46ac3c91050e689da |
| Cumulative Total Capacity (MW) | 26.65 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-4b7e15f46ac3c91050e689da |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Bad a Cheo Wind Farm |
| Customer Name | RWE RENEWABLES UK SWINDON LIMITED |
| Connection Site | Mybster 3 33kV Substation |
| Stage | Not obtained |
| MW Connected | 26.65 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 26.65 |
| MW Effective From | Not obtained |
| Project Status | Built |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005ilUQAQ |
| Project Number | PRO-000018 |
| Gate | Not obtained |
| Original text | Built |
| source_record_id | csv:row:106 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:106
Sources EV-4b7e15f46ac3c91050e689daEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 2fc974607d8a38971a43d67a20db235ae86c64a3f9a33ad94faf12ba9a844778
Usage terms NESO Open Data Licence