Banc y Celyn Energy Park
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-05033dec3576b4b19af1e76d |
| MW Increase / Decrease | 165 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-05033dec3576b4b19af1e76d |
| Cumulative Total Capacity (MW) | 165 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-05033dec3576b4b19af1e76d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Banc y Celyn Energy Park |
| Customer Name | PARC YNNI BANC Y CELYN CYF |
| Connection Site | Rassau GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 165.00 |
| Cumulative Total Capacity (MW) | 165.00 |
| MW Effective From | 2037-10-31 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore |
| Project ID | a0l8e0000012f3tAAA |
| Project Number | PRO-004395 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:119 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:119
Sources EV-05033dec3576b4b19af1e76dEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1e511062e3ed84981f24c2d2b5a9b81bcecc7a15e7253d93a3e22826fe57f7ec
Usage terms NESO Open Data Licence
