Causeymire 2 Wind Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-484a07bd402ae05f122788d7 |
| MW Increase / Decrease | 39.6 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-484a07bd402ae05f122788d7 |
| Cumulative Total Capacity (MW) | 39.6 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-484a07bd402ae05f122788d7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Causeymire 2 Wind Farm |
| Customer Name | HEADWIND DEVELOPMENT SERVICES LIMITED |
| Connection Site | Mybster 4 132/33kV GSP Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 39.60 |
| Cumulative Total Capacity (MW) | 39.60 |
| MW Effective From | 2034-10-31 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | SHET |
| Plant Type | Wind Onshore |
| Project ID | a0l8e0000012kqcAAA |
| Project Number | PRO-004778 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:370 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:370
Sources EV-484a07bd402ae05f122788d7Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 cbe2d7b8cd2f30d27d42ba967d6f126eb670dd1247029f5917cd89d13e006225
Usage terms NESO Open Data Licence
