BF88 Oakley
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c9b5bbe18cf1379141c717ec |
| MW Increase / Decrease | 1000 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c9b5bbe18cf1379141c717ec |
| Cumulative Total Capacity (MW) | 1000 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-c9b5bbe18cf1379141c717ec |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | BF88 Oakley |
| Customer Name | BLUEFIELD RENEWABLE DEVELOPMENTS LIMITED |
| Connection Site | Chiltern Connection Node C 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 1000.00 |
| Cumulative Total Capacity (MW) | 1000.00 |
| MW Effective From | 2038-11-01 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0l8e000001Hy11AAC |
| Project Number | PRO-004319 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:180 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:180
Sources EV-c9b5bbe18cf1379141c717ecEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4f92bb1b10b36f0e3a4b32c6c877352ee4781f948f79463b9a7a7365c89565a5
Usage terms NESO Open Data Licence