Beanacre BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3e1c76ccb47b1a461ab58a91 |
| MW Increase / Decrease | 200 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3e1c76ccb47b1a461ab58a91 |
| Cumulative Total Capacity (MW) | 200 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3e1c76ccb47b1a461ab58a91 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Beanacre BESS |
| Customer Name | Grenergy Renewables UK Limited |
| Connection Site | Melksham B 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 200.00 |
| Cumulative Total Capacity (MW) | 200.00 |
| MW Effective From | 2037-09-15 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005iwoQAA |
| Project Number | PRO-002452 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:136 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:136
Sources EV-3e1c76ccb47b1a461ab58a91Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 53984394b6c76dee0de797b88f650e6742fc9f3c6b4aef38d437dd9141f438ce
Usage terms NESO Open Data Licence