DAVIDSON FARM PV AND BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3ae9f7544637b874828d311b |
| MW Increase / Decrease | 45 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3ae9f7544637b874828d311b |
| Cumulative Total Capacity (MW) | 45 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-3ae9f7544637b874828d311b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | DAVIDSON FARM PV AND BESS |
| Customer Name | IG Renewables Limited |
| Connection Site | Blackhillock 2 400/33kV GSP Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 45.00 |
| Cumulative Total Capacity (MW) | 45.00 |
| MW Effective From | 2035-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0lJ9000000PEayIAG |
| Project Number | PRO-005808 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:165 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:165
Sources EV-3ae9f7544637b874828d311bEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 fca6e6067d6ab27123fac3e7ad543a5bdb3a464d17e769881449fbe66ade8766
Usage terms NESO Open Data Licence