Buckies Farm BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b36fd3a37ad954bdb9ff5157 |
| MW Increase / Decrease | 50 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b36fd3a37ad954bdb9ff5157 |
| Cumulative Total Capacity (MW) | 50 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-b36fd3a37ad954bdb9ff5157 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Buckies Farm BESS |
| Customer Name | Opdenergy UK 15 Limited |
| Connection Site | Thurso South 132/33kV GSP Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 50.00 |
| Cumulative Total Capacity (MW) | 50.00 |
| MW Effective From | 2030-10-30 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000001HxR3AAK |
| Project Number | PRO-004252 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:91 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:91
Sources EV-b36fd3a37ad954bdb9ff5157Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 7f41b3b0bbb66318e02922249a2bc1c8659a8241808f00d748ffe1b76083de83
Usage terms NESO Open Data Licence