Dunns Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-864881deaeeb82c26747b19c |
| MW Increase / Decrease | 22.8 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-864881deaeeb82c26747b19c |
| Cumulative Total Capacity (MW) | 22.8 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-864881deaeeb82c26747b19c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Dunns Farm |
| Customer Name | SP DISTRIBUTION PLC |
| Connection Site | East Kilbride South 275/33kV |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 22.80 |
| Cumulative Total Capacity (MW) | 22.80 |
| MW Effective From | 2027-10-29 |
| Project Status | Scoping |
| HOST TO | SPT |
| Plant Type | Energy Storage System |
| Project ID | a0l8e0000011yBbAAI |
| Project Number | PRO-003504 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:189 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:189
Sources EV-864881deaeeb82c26747b19cEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 6f989b798e461bdb14c4987ac74868267575fa3ebc709b629865d86464d900f6
Usage terms NESO Open Data Licence