Burnside Battery Storage Park
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-b74393bc95e590b984831e08 |
| MW Increase / Decrease | 49.9 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-b74393bc95e590b984831e08 |
| Cumulative Total Capacity (MW) | 49.9 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-b74393bc95e590b984831e08 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Burnside Battery Storage Park |
| Customer Name | SUNSHINE PROJECT 01 LIMITED |
| Connection Site | Charleston GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 49.90 |
| Cumulative Total Capacity (MW) | 49.90 |
| MW Effective From | 2027-10-31 |
| Project Status | Awaiting Consents |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e0000011yXlAAI |
| Project Number | PRO-003520 |
| Gate | 1 |
| Original text | Awaiting Consents |
| source_record_id | csv:row:101 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:101
Sources EV-b74393bc95e590b984831e08Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2006231c9062db7df1f94fb7e3d9daa490bd652fbd1304b947d844d7448b23dc
Usage terms NESO Open Data Licence