Burnside Farm PV
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e05546d876d93ee054e3b6fd |
| MW Increase / Decrease | 32.58 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e05546d876d93ee054e3b6fd |
| Cumulative Total Capacity (MW) | 32.58 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-e05546d876d93ee054e3b6fd |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Burnside Farm PV |
| Customer Name | ELGIN ENERGY ES CO LIMITED |
| Connection Site | Tarland 132/33kV GSP Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 32.58 |
| Cumulative Total Capacity (MW) | 32.58 |
| MW Effective From | 2032-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | PV Array (Photo Voltaic/solar) |
| Project ID | a0l8e000000f6yVAAQ |
| Project Number | PRO-003994 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:102 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:102
Sources EV-e05546d876d93ee054e3b6fdEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c1b52de2bcc673b5f644da2a83e35126d449da1251832ffa1c16b53a999a29f6
Usage terms NESO Open Data Licence