Ardtrostan Hydro
Connection register · awaiting consents
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-b5692e8891a69277c029ee1d |
| MW Increase / Decrease | 0.1 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-b5692e8891a69277c029ee1d |
| Cumulative Total Capacity (MW) | 0.1 MW | Original source column definition · project stage · Awaiting Consents As-of date 2026-10-01 Sources EV-b5692e8891a69277c029ee1d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Ardtrostan Hydro |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Killin GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 0.10 |
| Cumulative Total Capacity (MW) | 0.10 |
| MW Effective From | 2024-11-30 |
| Project Status | Awaiting Consents |
| HOST TO | SHET |
| Plant Type | Hydro |
| Project ID | a0l8e000000f4iTAAQ |
| Project Number | PRO-003863 |
| Gate | Not obtained |
| Original text | Awaiting Consents |
| source_record_id | csv:row:20 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:20
Sources EV-b5692e8891a69277c029ee1dEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 44edbe101f13d46df203987f26bc2d172c807667e190a918f2a5ba0c54e6f303
Usage terms NESO Open Data Licence
