Berry BPI Wind Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-ebab785c5c900de10ce2fc2a |
| MW Increase / Decrease | 10 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-ebab785c5c900de10ce2fc2a |
| Cumulative Total Capacity (MW) | 10 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-ebab785c5c900de10ce2fc2a |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Berry BPI Wind Farm |
| Customer Name | SP DISTRIBUTION PLC |
| Connection Site | Saltcoats A & B (SPD) GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 10.00 |
| Cumulative Total Capacity (MW) | 10.00 |
| MW Effective From | 2028-08-21 |
| Project Status | Scoping |
| HOST TO | SPT |
| Plant Type | Wind Onshore |
| Project ID | a0l8e000001HxvyAAC |
| Project Number | PRO-004314 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:58 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:58
Sources EV-ebab785c5c900de10ce2fc2aEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 f7dbf4944fa0badb2e1f1cf51aca459a65349213923ee96f74bb5396ae9d0380
Usage terms NESO Open Data Licence
