Dunoon GSP (DNO)
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-04d60e4bc2d389a426eb25eb |
| MW Increase / Decrease | 0.48 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-04d60e4bc2d389a426eb25eb |
| Cumulative Total Capacity (MW) | 0.48 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-04d60e4bc2d389a426eb25eb |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Dunoon GSP (DNO) |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Dunoon GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 0.48 |
| Cumulative Total Capacity (MW) | 0.48 |
| MW Effective From | 2025-03-25 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005iY4QAI |
| Project Number | PRO-002317 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:191 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:191
Sources EV-04d60e4bc2d389a426eb25ebEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 e4ad57f2544e9526ebac57cf6f8d95f9f927ab64de47142f6249986884514bfe
Usage terms NESO Open Data Licence