United Kingdom · Grid connection register

Corrimony

공식 원천의 전력 객체 · built

Project stage · source basis
Stage requires verification · built
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_embedded

Corrimony

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected11.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-756d45bc2be6343e323e14f1
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-756d45bc2be6343e323e14f1
Cumulative Total Capacity (MW)11.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-756d45bc2be6343e323e14f1
Detailed source fields
Original source fieldPublished value or condition
Project NameCorrimony
Customer NameCORRIMONY ENERGY LIMITED
Connection SiteFasnakyle GSP
StageNot obtained
MW Connected11.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)11.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iRHQAY
Project NumberPRO-001307
GateNot obtained
Original textBuilt
source_record_idcsv:row:147

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:147

Sources EV-756d45bc2be6343e323e14f1
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8e3d1a1ba7128e2cd6e45acf39dff61f0787b14e352e89da25dc2f2248de84fc

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel