Carmuirs
Connection register · built
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 19.9 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-bc4e170df044bd9519216889 |
| MW Increase / Decrease | 0 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-bc4e170df044bd9519216889 |
| Cumulative Total Capacity (MW) | 19.9 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-bc4e170df044bd9519216889 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Carmuirs |
| Customer Name | SP DISTRIBUTION PLC |
| Connection Site | Bonnybridge 132/33kV |
| Stage | Not obtained |
| MW Connected | 19.90 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 19.90 |
| MW Effective From | Not obtained |
| Project Status | Built |
| HOST TO | SPT |
| Plant Type | CCGT (Combined Cycle Gas Turbine) |
| Project ID | a0l4L0000005ihoQAA |
| Project Number | PRO-000775 |
| Gate | Not obtained |
| Original text | Built |
| source_record_id | csv:row:122 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:122
Sources EV-bc4e170df044bd9519216889Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c4355ef05d37aea3783a268f2d5b83a62ddb68c07a5c704d0fd49ede1ead7a6c
Usage terms NESO Open Data Licence
