Balgonie Farm
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-a4245f08d9794161cea46034 |
| MW Increase / Decrease | 50 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-a4245f08d9794161cea46034 |
| Cumulative Total Capacity (MW) | 50 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-a4245f08d9794161cea46034 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Balgonie Farm |
| Customer Name | Opdenergy UK 12 Limited |
| Connection Site | ABERNETHY 132/33KV GRID SUPPLY POINT SUBSTATION |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 50.00 |
| Cumulative Total Capacity (MW) | 50.00 |
| MW Effective From | 2028-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000001HpdFAAS |
| Project Number | PRO-004123 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:34 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:34
Sources EV-a4245f08d9794161cea46034Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 094d794ec0fb4e64a3683fd40180409e989f6fc501be5b7608ed1bc901194958
Usage terms NESO Open Data Licence