Cairntawie
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7bd2fc3004deab08ce88391d |
| MW Increase / Decrease | 10 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7bd2fc3004deab08ce88391d |
| Cumulative Total Capacity (MW) | 10 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-7bd2fc3004deab08ce88391d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Cairntawie |
| Customer Name | WIND 2 LIMITED |
| Connection Site | ST FERGUS GAS 132/11KV SUBSTATION |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 10.00 |
| Cumulative Total Capacity (MW) | 10.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;Wind Onshore |
| Project ID | a0l8e0000012guTAAQ |
| Project Number | PRO-004498 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:110 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:110
Sources EV-7bd2fc3004deab08ce88391dEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 6d1b8bbda0d9bcd71595efd32474500f56675ed580cc858e7bedc4f378d633e6
Usage terms NESO Open Data Licence