United States of America · Generator · plant location

74th Street / GT2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Consolidated Edison Co-NY Inc
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
40.768, -73.9515

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

74th Street / GT2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)18.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a2d6d291983daeb6e996106e
Net Summer Capacity (MW)19.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a2d6d291983daeb6e996106e
Net Winter Capacity (MW)21.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a2d6d291983daeb6e996106e
Detailed source fields
Original source fieldPublished value or condition
Entity ID4226
Entity NameConsolidated Edison Co-NY Inc
Plant ID2504
Plant Name74th Street
Google MapMap
Bing MapMap
Plant StateNY
CountyNew York
Balancing Authority CodeNYIS
SectorElectric Utility
Generator IDGT2
Nameplate Capacity (MW)18.5
Net Summer Capacity (MW)19.3
Net Winter Capacity (MW)21.9
TechnologyPetroleum Liquids
Energy Source CodeKER
Prime Mover CodeGT
Operating Month10
Operating Year1968
Status(OP) Operating
Latitude40.768
Longitude-73.9515
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:3763

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:3758

Sources EV-06e22c0e9e607332a7d01180
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ed63b4ea676a01c7f8c6ac59e3ec7f8dbea4f2e353723c581d14cbd7d299dadb

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:3763

Sources EV-a2d6d291983daeb6e996106e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 72a160520f1735d4c71ea4a911ef7b9fff1bf0f83fd2906ecffd91cab0f4e9f4

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel