Australia · Generator · plant location

Borambola Hybrid - KCI

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Borambola Hybrid - KCI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)6.7 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-9d45fbc9840c82c53ba29e49
Unit Capacity (MW AC)5.15 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-9d45fbc9840c82c53ba29e49
Aggregated Nameplate Capacity (MW DC)160.8 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-9d45fbc9840c82c53ba29e49
Aggregated Nameplate Capacity (MW AC)123.6 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-9d45fbc9840c82c53ba29e49
Agg Nameplate Storage Capacity (MWh)494.4 MWhOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-9d45fbc9840c82c53ba29e49
Detailed source fields
Original source fieldPublished value or condition
Survey ID3266
Site NameBorambola Hybrid - KCI
KCI IdN00290
Site OwnerBritish Solar Renewables Pty Ltd
RegionNSW1
Max Site Capacity (AC)90
Gen Info Unit ID326602
Unit NameBorambola Hybrid BESS
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count24
Unit Capacity (MW DC)6.7
Unit Capacity (MW AC)5.15
Aggregated Nameplate Capacity (MW DC)160.8
Aggregated Nameplate Capacity (MW AC)123.6
Agg Nameplate Storage Capacity (MWh)494.4
Commitment StatusPublicly Announced
Full Commercial Use Date2031-08-01T00:00:00
Expected Closure Year2051
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-29T13:15:18
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:164

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:164

Sources EV-9d45fbc9840c82c53ba29e49
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 6eeca6d9f01e143e653ed14f857ca84d1fa6ed79f179d81239bcc7ac19890495

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel