Australia · Generator · plant location

Bowning Hybrid Plant

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bowning Hybrid Plant

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)90 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-cc593a3af6603a6d883ab55f
Aggregated Nameplate Capacity (MW AC)90 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-cc593a3af6603a6d883ab55f
Detailed source fields
Original source fieldPublished value or condition
Survey ID3183
Site NameBowning Hybrid Plant
KCI IdN00277, N00278
Site OwnerBSR EPC Pty Ltd
RegionNSW1
Max Site Capacity (AC)90
Gen Info Unit ID318301
Unit NameBOW_GU1
Technology TypeSolar PV
Technology DetailFixed
Dispatch TypeSemi-scheduled
Unit Count1
Unit Capacity (MW AC)90
Aggregated Nameplate Capacity (MW AC)90
Commitment StatusPublicly Announced
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-01-22T16:34:27
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:177

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:177

Sources EV-cc593a3af6603a6d883ab55f
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 3ea11ac8369828e4d6598c45d0c933c06b53889be97a8efbb179255f9a4f56ab

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel