Australia · Generator · plant location

Bendenine

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bendenine

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)8 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-6e10805d706ffda2e4bc97e3
Unit Capacity (MW AC)8 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-6e10805d706ffda2e4bc97e3
Aggregated Nameplate Capacity (MW DC)720 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-6e10805d706ffda2e4bc97e3
Aggregated Nameplate Capacity (MW AC)720 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-6e10805d706ffda2e4bc97e3
Detailed source fields
Original source fieldPublished value or condition
Survey ID3177
Site NameBendenine
Site OwnerWind Prospect PL
RegionNSW1
Max Site Capacity (AC)720
Gen Info Unit ID317701
Unit NameBendenine Wind Farm
Technology TypeWind
Technology DetailOnshore
Dispatch TypeSemi-scheduled
Unit Count90
Unit Capacity (MW DC)8
Unit Capacity (MW AC)8
Aggregated Nameplate Capacity (MW DC)720
Aggregated Nameplate Capacity (MW AC)720
Commitment StatusPublicly Announced
Full Commercial Use Date2030-07-01T00:00:00
Expected Closure Year2070
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-22T21:55:22
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:98

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:98

Sources EV-6e10805d706ffda2e4bc97e3
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 de95734578274701576fb84120293ada1b133179d96ef6f1d0661825f52745c9

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel