Australia · Generator · plant location

Armidale East BESS

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Armidale East BESS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)4.2 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-316b9e522b4e47be28ac226d
Unit Capacity (MW AC)3.61 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-316b9e522b4e47be28ac226d
Aggregated Nameplate Capacity (MW DC)445.2 MWdcOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-316b9e522b4e47be28ac226d
Aggregated Nameplate Capacity (MW AC)382.66 MWacOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-316b9e522b4e47be28ac226d
Agg Nameplate Storage Capacity (MWh)1889.98 MWhOriginal source column definition · Generation-register unit · Anticipated
As-of date 2026-07-31
Sources EV-316b9e522b4e47be28ac226d
Detailed source fields
Original source fieldPublished value or condition
Survey ID3017
Site NameArmidale East BESS
Site OwnerFRV Services Australia
RegionNSW1
Max Site Capacity (AC)315
Gen Info Unit ID301701
Unit NameAEBS_GU1
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count106
Unit Capacity (MW DC)4.2
Unit Capacity (MW AC)3.61
Aggregated Nameplate Capacity (MW DC)445.2
Aggregated Nameplate Capacity (MW AC)382.66
Agg Nameplate Storage Capacity (MWh)1889.98
Commitment StatusAnticipated
Full Commercial Use Date2030-08-30T00:00:00
Expected Closure Year2060
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-06-17T14:46:28
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnticipated
source_record_idGenerator Information:29

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:29

Sources EV-316b9e522b4e47be28ac226d
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 ba3fd3777033967d95d2c18d0b0eca74032b746862a76e484d4e48acb9916c46

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:13

Sources EV-b6ed1433ac0c0f76e4f85809
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 f85e8aa27ef4972e0ac4d7ba46184e3dc6d197343d0e674b203c58f60b534210

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel