Boulka Park Solar Farm
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW AC) | 100 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-6a0d32e605d7ca1db6d2bdfe |
| Aggregated Nameplate Capacity (MW AC) | 100 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-6a0d32e605d7ca1db6d2bdfe |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 2816 |
| Site Name | Boulka Park Solar Farm |
| KCI Id | V00136 |
| Site Owner | The Trustee for X-ELIO BOULKA PARK TRUST |
| Region | VIC1 |
| Max Site Capacity (AC) | 100 |
| Gen Info Unit ID | 281601 |
| Unit Name | BPSF_GU1 |
| Technology Type | Solar PV |
| Technology Detail | Single Axis Tracking |
| Dispatch Type | Semi-scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 100 |
| Aggregated Nameplate Capacity (MW AC) | 100 |
| Commitment Status | Publicly Announced |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2025-03-13T23:49:39 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | Publicly Announced |
| source_record_id | Generator Information:173 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:173
Sources EV-6a0d32e605d7ca1db6d2bdfeEvidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 1b7dabb7fcf5daf2496b1a91b2a938d2cf3a571c14acc4e3c80381a184876b27
Usage terms AEMO general copyright permission subject to exceptions
