Australia · Generator · plant location

Bango 999 Wind Farm

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bango 999 Wind Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)5.3 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-5f9c7c32b9e27b566783127b
Aggregated Nameplate Capacity (MW AC)84.8 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-5f9c7c32b9e27b566783127b
Detailed source fields
Original source fieldPublished value or condition
Survey ID1843
Site NameBango 999 Wind Farm
KCI IdN00019
Site OwnerBWF Nominees Pty Ltd as trustee for the BWF Trust
RegionNSW1
Max Site Capacity (AC)82
Gen Info Unit ID184302
Unit NameBango 999 Wind Farm
Technology TypeWind
Technology DetailOnshore
DUIDBANGOWF2
Dispatch TypeSemi-scheduled
Unit Count16
Unit Capacity (MW AC)5.3
Aggregated Nameplate Capacity (MW AC)84.8
Commitment StatusIn Service
Expected Closure Year2045
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-19T22:30:00
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:51

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:51

Sources EV-5f9c7c32b9e27b566783127b
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0303b5d5ec079d88c856d00700bf7f70d6c4bd997234ed4e0ec6c4e884e6d583

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:24

Sources EV-b220195ed531ea065f2158b3
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 54183e9053b30c18177e86d59d54fb36b0cd0d462cdddc2a3c62ee0fdfc93978

Usage terms AEMO general copyright permission subject to exceptions