Bango 999 Wind Farm
発電機 · 運営
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Unit Capacity (MW AC) | 5.3 MWac | 原出典の列定義 · 発電登録単位 · In Service 基準日 2026-07-31 根拠 EV-5f9c7c32b9e27b566783127b |
| Aggregated Nameplate Capacity (MW AC) | 84.8 MWac | 原出典の列定義 · 発電登録単位 · In Service 基準日 2026-07-31 根拠 EV-5f9c7c32b9e27b566783127b |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Survey ID | 1843 |
| Site Name | Bango 999 Wind Farm |
| KCI Id | N00019 |
| Site Owner | BWF Nominees Pty Ltd as trustee for the BWF Trust |
| Region | NSW1 |
| Max Site Capacity (AC) | 82 |
| Gen Info Unit ID | 184302 |
| Unit Name | Bango 999 Wind Farm |
| Technology Type | Wind |
| Technology Detail | Onshore |
| DUID | BANGOWF2 |
| Dispatch Type | Semi-scheduled |
| Unit Count | 16 |
| Unit Capacity (MW AC) | 5.3 |
| Aggregated Nameplate Capacity (MW AC) | 84.8 |
| Commitment Status | In Service |
| Expected Closure Year | 2045 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-19T22:30:00 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文の状態 | In Service |
| source_record_id | Generator Information:51 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 2件
資料の基準 2026-07-31 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Generator Information:51
根拠 EV-5f9c7c32b9e27b566783127b資料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0303b5d5ec079d88c856d00700bf7f70d6c4bd997234ed4e0ec6c4e884e6d583
利用条件 AEMO general copyright permission subject to exceptions
資料の基準 2026-07-24 ・取得確認 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文内の位置 Expected Closure Year:24
根拠 EV-b220195ed531ea065f2158b3資料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 54183e9053b30c18177e86d59d54fb36b0cd0d462cdddc2a3c62ee0fdfc93978
利用条件 AEMO general copyright permission subject to exceptions
