Bango 999 Wind Farm
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 5.3 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-5f9c7c32b9e27b566783127b |
| Aggregated Nameplate Capacity (MW AC) | 84.8 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-5f9c7c32b9e27b566783127b |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1843 |
| Site Name | Bango 999 Wind Farm |
| KCI Id | N00019 |
| Site Owner | BWF Nominees Pty Ltd as trustee for the BWF Trust |
| Region | NSW1 |
| Max Site Capacity (AC) | 82 |
| Gen Info Unit ID | 184302 |
| Unit Name | Bango 999 Wind Farm |
| Technology Type | Wind |
| Technology Detail | Onshore |
| DUID | BANGOWF2 |
| Dispatch Type | Semi-scheduled |
| Unit Count | 16 |
| Unit Capacity (MW AC) | 5.3 |
| Aggregated Nameplate Capacity (MW AC) | 84.8 |
| Commitment Status | In Service |
| Expected Closure Year | 2045 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-19T22:30:00 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:51 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:51
依据 EV-5f9c7c32b9e27b566783127b资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0303b5d5ec079d88c856d00700bf7f70d6c4bd997234ed4e0ec6c4e884e6d583
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:24
依据 EV-b220195ed531ea065f2158b3资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 54183e9053b30c18177e86d59d54fb36b0cd0d462cdddc2a3c62ee0fdfc93978
使用条件 AEMO general copyright permission subject to exceptions
