Australia · Generator · plant location

Snowy 2.0.

공식 원천의 전력 객체 · Committed development plan

Project stage · source basis
Stage requires verification · committed
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Snowy 2.0.

Generator · Committed development plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)371 MWacOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-59d937edf703ceb7abbaf299
Aggregated Nameplate Capacity (MW AC)371 MWacOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-59d937edf703ceb7abbaf299
Agg Nameplate Storage Capacity (MWh)58330 MWhOriginal source column definition · Generation-register unit · Committed
As-of date 2026-07-31
Sources EV-59d937edf703ceb7abbaf299
Detailed source fields
Original source fieldPublished value or condition
Survey ID1752
Site NameSnowy 2.0.
Site OwnerSnowy Hydro Ltd
RegionNSW1
Max Site Capacity (AC)2200
Gen Info Unit ID175204
Unit NameSNO2PH04
Technology TypeHydro
Technology DetailPumped Hydro
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)371
Aggregated Nameplate Capacity (MW AC)371
Agg Nameplate Storage Capacity (MWh)58330
Commitment StatusCommitted
Full Commercial Use Date2028-12-31T00:00:00
Expected Closure Year2129
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-06-11T11:38:24
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textCommitted
source_record_idGenerator Information:1339

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1339

Sources EV-59d937edf703ceb7abbaf299
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 e3f5a5fae150bce8941af1fa816df015f4133b183cdefd36356a054e7a9e2836

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:620

Sources EV-886ef0ac42285d8373ce0a58
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 e3fb3a0a69d1dc16e026ee6bf3b7932dbb29b5f03a9dd12c60a754e6e56a9692

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel