Australia · Generator · plant location

Tungatinah

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Tungatinah

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)25 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-101e14d9a825b8167f9a79c6
Aggregated Nameplate Capacity (MW AC)25 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-101e14d9a825b8167f9a79c6
Detailed source fields
Original source fieldPublished value or condition
Survey ID1216
Site NameTungatinah
Site OwnerHydro-Electric Corporation
RegionTAS1
Max Site Capacity (AC)142
Gen Info Unit ID121602
Unit NameTungatinah:2
Technology TypeHydro
Technology DetailDam
DUIDTUNGATIN
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)25
Aggregated Nameplate Capacity (MW AC)25
Commitment StatusIn Service
Expected Closure Year2100
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-23T12:53:03
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:1549

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:1549

Sources EV-101e14d9a825b8167f9a79c6
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 c36d1cb9856b12a005d9e5174140652445c4344febb5f0874c5e2a18ef4c1475

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:725

Sources EV-a3178161c0b64b83e3a49441
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 a1cc43fb5a5c7686da9b1028c0756b6da7f5fa39acbe11fee835ed0a54dc5e4d

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel