Australia · Generator · plant location

Berrybank Wind Farm

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Berrybank Wind Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)4.2 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace
Aggregated Nameplate Capacity (MW AC)180.6 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-2b329d38592a2ceefae8aace
Detailed source fields
Original source fieldPublished value or condition
Survey ID1018
Site NameBerrybank Wind Farm
Site OwnerBerrbank Development Pty ltd
RegionVIC1
Max Site Capacity (AC)281.1
Gen Info Unit ID101803
Unit NameBerrybank Wind Farm - Stage 1: Units 1-43
Technology TypeWind
Technology DetailOnshore
DUIDBRYB1WF1
Dispatch TypeSemi-scheduled
Unit Count43
Unit Capacity (MW AC)4.2
Aggregated Nameplate Capacity (MW AC)180.6
Commitment StatusIn Service
Expected Closure Year2051
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-17T13:47:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:104

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:104

Sources EV-2b329d38592a2ceefae8aace
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:46

Sources EV-1f5478134a71153c3bc13dc7
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 87fd87ecdf6522462c7d9a3a954494dd9ca8da7a15911fd74c30d72e4f645de5

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel