Berrybank Wind Farm
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 4.2 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-2b329d38592a2ceefae8aace |
| Aggregated Nameplate Capacity (MW AC) | 180.6 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-2b329d38592a2ceefae8aace |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1018 |
| Site Name | Berrybank Wind Farm |
| Site Owner | Berrbank Development Pty ltd |
| Region | VIC1 |
| Max Site Capacity (AC) | 281.1 |
| Gen Info Unit ID | 101803 |
| Unit Name | Berrybank Wind Farm - Stage 1: Units 1-43 |
| Technology Type | Wind |
| Technology Detail | Onshore |
| DUID | BRYB1WF1 |
| Dispatch Type | Semi-scheduled |
| Unit Count | 43 |
| Unit Capacity (MW AC) | 4.2 |
| Aggregated Nameplate Capacity (MW AC) | 180.6 |
| Commitment Status | In Service |
| Expected Closure Year | 2051 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-17T13:47:13 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:104 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:104
依据 EV-2b329d38592a2ceefae8aace资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 2bec0bf478cb654280f4a28bf2696a56ade953fe37302324c95b3e345910dc23
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:46
依据 EV-1f5478134a71153c3bc13dc7资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 87fd87ecdf6522462c7d9a3a954494dd9ca8da7a15911fd74c30d72e4f645de5
使用条件 AEMO general copyright permission subject to exceptions