Australia · Generator · plant location

Barron Gorge

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Barron Gorge

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)35 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-556165bda906a45a944cb2e6
Aggregated Nameplate Capacity (MW AC)35 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-556165bda906a45a944cb2e6
Detailed source fields
Original source fieldPublished value or condition
Survey ID1012
Site NameBarron Gorge
Site OwnerCleanCo Queensland Limited
RegionQLD1
Max Site Capacity (AC)66
Gen Info Unit ID101202
Unit NameBarron Gorge:2
Technology TypeHydro
Technology DetailRun of River
DUIDBARRON-2
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)35
Aggregated Nameplate Capacity (MW AC)35
Commitment StatusIn Service
Expected Closure Year2063
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-27T12:18:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:69

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:69

Sources EV-556165bda906a45a944cb2e6
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:34

Sources EV-c6a46583a94b2ae85ccc40e8
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 690301a58319c245130592fc4d7e61ad5b73f7224e08343ace9ab32f75c95b75

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel