POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Barron Gorge Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 35 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 Aggregated Nameplate Capacity (MW AC) 35 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6
Detailed source fields Original source field Published value or condition Survey ID 1012 Site Name Barron Gorge Site Owner CleanCo Queensland Limited Region QLD1 Max Site Capacity (AC) 66 Gen Info Unit ID 101202 Unit Name Barron Gorge:2 Technology Type Hydro Technology Detail Run of River DUID BARRON-2 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 35 Aggregated Nameplate Capacity (MW AC) 35 Commitment Status In Service Expected Closure Year 2063 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-27T12:18:13 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:69
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:34
Sources EV-c6a46583a94b2ae85ccc40e8 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 690301a58319c245130592fc4d7e61ad5b73f7224e08343ace9ab32f75c95b75 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 1012 Gen Info Unit ID 101202 Site Name Barron Gorge DUID BARRON-2 Commitment Status In Service Expected Closure Year 2063 Survey Latest Update Date 2026-03-27T12:18:13 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:34
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:34
Sources EV-c6a46583a94b2ae85ccc40e8 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 690301a58319c245130592fc4d7e61ad5b73f7224e08343ace9ab32f75c95b75 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1012 Site Name Barron Gorge Site Owner CleanCo Queensland Limited Region QLD1 Max Site Capacity (AC) 66 Gen Info Unit ID 101202 Unit Name Barron Gorge:2 Technology Type Hydro Technology Detail Run of River DUID BARRON-2 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 35 Aggregated Nameplate Capacity (MW AC) 35 Commitment Status In Service Expected Closure Year 2063 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-27T12:18:13 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:69
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 33 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-556165bda906a45a944cb2e6 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:69
Sources EV-556165bda906a45a944cb2e6 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset