Barron Gorge
发电机 · 运营
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Unit Capacity (MW AC) | 35 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-556165bda906a45a944cb2e6 |
| Aggregated Nameplate Capacity (MW AC) | 35 MWac | 原始来源列定义 · 发电登记单元 · In Service 基准日期 2026-07-31 依据 EV-556165bda906a45a944cb2e6 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Survey ID | 1012 |
| Site Name | Barron Gorge |
| Site Owner | CleanCo Queensland Limited |
| Region | QLD1 |
| Max Site Capacity (AC) | 66 |
| Gen Info Unit ID | 101202 |
| Unit Name | Barron Gorge:2 |
| Technology Type | Hydro |
| Technology Detail | Run of River |
| DUID | BARRON-2 |
| Dispatch Type | Scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 35 |
| Aggregated Nameplate Capacity (MW AC) | 35 |
| Commitment Status | In Service |
| Expected Closure Year | 2063 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-03-27T12:18:13 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| 原文状态 | In Service |
| source_record_id | Generator Information:69 |
位置: 未获取坐标 · 不在地图标注
原文、基准日期与核实日期 2条
数据来源 2026-07-31 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Generator Information:69
依据 EV-556165bda906a45a944cb2e6资料SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 a3de6e3bae6456e58845bf314556bb8db11129c0b5d614db9b5ef4947da93ce6
使用条件 AEMO general copyright permission subject to exceptions
数据来源 2026-07-24 · 收集核实 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
原文位置 Expected Closure Year:34
依据 EV-c6a46583a94b2ae85ccc40e8资料SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 690301a58319c245130592fc4d7e61ad5b73f7224e08343ace9ab32f75c95b75
使用条件 AEMO general copyright permission subject to exceptions
