Australia · Generator · plant location

Barron Gorge

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Barron Gorge

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)35 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-00599e88789c6d2f5799c7d0
Aggregated Nameplate Capacity (MW AC)35 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-00599e88789c6d2f5799c7d0
Detailed source fields
Original source fieldPublished value or condition
Survey ID1012
Site NameBarron Gorge
Site OwnerCleanCo Queensland Limited
RegionQLD1
Max Site Capacity (AC)66
Gen Info Unit ID101201
Unit NameBarron Gorge:1
Technology TypeHydro
Technology DetailRun of River
DUIDBARRON-1
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)35
Aggregated Nameplate Capacity (MW AC)35
Commitment StatusIn Service
Expected Closure Year2063
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-27T12:18:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:68

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:68

Sources EV-00599e88789c6d2f5799c7d0
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 5bb8fab08323e5aac38e0e714fe748abd0c50112a8e883623abbd6653ed5f80a

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:33

Sources EV-524fa279bfcbca74302608c9
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 cbefafbd96e034bed7e57e99b3f2835078f3945e5a95e7269c5a5cbf35927584

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel