Australia · Generator · plant location

Ballarat Base Hospital Plant

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Ballarat Base Hospital Plant

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)0.8 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-a03d5bf9158e5158b9208cb9
Aggregated Nameplate Capacity (MW AC)1.6 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-a03d5bf9158e5158b9208cb9
Detailed source fields
Original source fieldPublished value or condition
Survey ID1007
Site NameBallarat Base Hospital Plant
Site OwnerBallarat Health Services
RegionVIC1
Max Site Capacity (AC)1
Gen Info Unit ID100701
Unit Name6203834176
Technology TypeGas Turbine
Technology DetailOther
Gas Turbine Fuel TypeDiesel/ Fuel Oil
Dispatch TypeNon-scheduled
Unit Count2
Unit Capacity (MW AC)0.8
Aggregated Nameplate Capacity (MW AC)1.6
Commitment StatusIn Service
Expected Closure Year2033
Survey Last Requested Date2025-12-01T00:00:00
Survey Latest Update Date2024-10-19T07:26:40
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:47

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:47

Sources EV-a03d5bf9158e5158b9208cb9
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 1b0b972152cabb71babac4867a3e47a71f497c4bbfc0b3407760a7b7c2283e99

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:21

Sources EV-1d8b8f2c71553c4afa18046a
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 64e01ee2e41a1070befaf55277adb293d37dfd9ef7a5f5682daf24d5a38cec9b

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel