GLOBAL EVIDENCE COMPARISON

Global facility evidence comparison

Select up to three records from the map list to compare published values on the same basis.

Item당진 송산 IDC
CountrySouth Korea
Data TypeAnnounced development projects
Reported operatorCheck each original source
Review status공식 원천의 전력 객체 · Published statement
Data Reference DateNot stated
Collection review dateNot stated
IT capacityMW · IT · Project · as published

140 MW
Not stated
Evidence for this value

PUEratio · Design · Project · Design

1.33 ratio
Not stated
Evidence for this value

site aream2 · site area · Project · Undisclosed

43188 m2
Not stated
Evidence for this value

Gross floor aream2 · gross floor area · Project · Undisclosed

106716 m2
Not stated
Evidence for this value

Contracted electricity supply capacityMW · contract · Campus · developer claimed secured

300 MW
2026-09-14
Evidence for this value

planned capacity unspecifiedMW · unspecified · buildings A and B · Plan

200 MW
2026-09-14
Evidence for this value

planned capacity unspecifiedMW · unspecified · building C · permitting

100 MW
2026-09-14
Evidence for this value

rack power densitykW/rack · Design · rack · Design

160 kW/rack
2026-09-14
Evidence for this value

Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel