ItemBerwick 40MW Solar & BESS
CountryUnited Kingdom
Data TypeGrid connection register
Reported operatorCheck each original source
Review status공식 원천의 전력 객체 · scoping
Data Reference Date2026-10-01
Collection review date2026-10-05
MW ConnectedMW · Original source column definition · project stage · Scoping

0 MW
2026-10-01
Evidence for this value

MW Increase / DecreaseMW · Original source column definition · project stage · Scoping

40 MW
2026-10-01
Evidence for this value

Cumulative Total Capacity (MW)MW · Original source column definition · project stage · Scoping

40 MW
2026-10-01
Evidence for this value

Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel