Samsung SDS Sangam Data Center

24 World Cup buk-ro 60-gil, Mapo-gu, Seoul, South Korea

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

Operational

Public Power2024 Publicly Reported PUE: 1.35

Distinguish between power supply, UPS, and IT load

Facility SizeUrban Data Center

On-premises and Cloud

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

Source-backed facility metrics

Design values, targets and operator-disclosed figures are distinguished. Total facility capacity is not the remaining capacity available for lease, and kVA and kW are not used interchangeably.

Evidence records 0Facility metrics 0Official Source Text 0Last reviewed

Expand a category to check the source location and applicable scope. Review dates refer to document checks, not equipment changes.

Facility milestones and spatial scope

Publication, review and actual start dates are distinct. Occupancy approval does not establish commercial operation, and published capacity is not saleable inventory.

Event comparison date: 2026-10-16 · Latest evidenced event by date: Stage unverified

This shows the order of evidenced events and does not establish the facility’s overall current operating status.

No stage events with verified source dates are available. Review dates do not fill missing event dates.

Operating areas within facilities

  • Equinix Seoul SL1 · Operating area within parent facility · Samsung SDS Sangam Data Center

    This operating-area link follows the operator’s address placing SL1 on the third floor of Samsung SDS SangAm IT Center. It does not establish legal ownership or identical whole-building areas.
    Equinix ↗ · Confirm: 2026-10-11
    SL1 Address

Service-facility listings and physical building counts are distinct. These relationships are not a complete campus, building and zone inventory.

Saleable inventory and total market supply require separate verification.

Milestone and scope JSON

CENTER OVERVIEW

About the Center

Uptime M&O Stamp를 국내 최초로 취득했다고 공개한 도심 운영센터

01삼성SDS 공식 국내 센터망
02센터별 공개 PUE 분리 표기
03수전용량·IT Load는 별도 확인

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

PUE는 보고연도·운영범위에 따라 변하는 효율지표이며 수전용량이나 IT Load가 아닙니다. 삼성SDS 공식 보고서의 센터별 PUE와 공식 소개의 국내 5개 센터망을 구분해 기록했습니다.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel