● Plan

Princeton Digital Group SE1

414-2 Cheongcheon-dong, Bupyeong-gu, Incheon, South Korea

Center OverviewPhysical Sites · PowerSame operator
Operational StatusPlan

2028년 목표

Public PowerPlanned IT capacity: 48 MW

Distinguish between power supply, UPS, and IT load

Facility scaleSite area: 11,000 ㎡

Hyperscale·AI

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

CENTER OVERVIEW

About the Center

PDG가 한국 진출의 첫 거점으로 추진하는 수도권 AI·하이퍼스케일 캠퍼스입니다.

01Planned IT capacity: 48 MW
02Site area: 11,000 ㎡
032028년 목표·운영 전

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

48MW와 2028년은 계획값이며 운영 중 용량이 아닙니다. PDG의 장기 국내 500MW 구상과 첫 캠퍼스 48MW를 분리해 기록했습니다.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel