2028년 목표
Princeton Digital Group SE1
414-2 Cheongcheon-dong, Bupyeong-gu, Incheon, South Korea
Distinguish between power supply, UPS, and IT load
Hyperscale·AI
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
PDG가 한국 진출의 첫 거점으로 추진하는 수도권 AI·하이퍼스케일 캠퍼스입니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
48MW와 2028년은 계획값이며 운영 중 용량이 아닙니다. PDG의 장기 국내 500MW 구상과 첫 캠퍼스 48MW를 분리해 기록했습니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
