Opening in November 2025
KT Cloud Gasan AI Data Center
Gasan-dong, Geumcheon-gu, Seoul
Distinguish between power supply, UPS, and IT load
AI-dedicated · Liquid cooling
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
리퀴드 쿨링 상용화와 Colo.AI를 강조하는 AI 전용 센터. We confirmed the center name and role on the kt cloud official center network.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
Based on the announcement at the time of opening, facility power (40 MW) and IT load (26 MW) are distinguished. These figures do not represent current usage, remaining lease capacity, or expansion limits. Addresses and floor space are subject to further verification.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
