KT Cloud Gasan AI Data Center

Gasan-dong, Geumcheon-gu, Seoul

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

Opening in November 2025

Public PowerFacility power: 40 MW · IT load: 26 MW (Announced to open in 2025)

Distinguish between power supply, UPS, and IT load

Facility SizeCurrently verifying the official network of data centers and conducting further research on facility specifications.

AI-dedicated · Liquid cooling

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

CENTER OVERVIEW

About the Center

리퀴드 쿨링 상용화와 Colo.AI를 강조하는 AI 전용 센터. We confirmed the center name and role on the kt cloud official center network.

01Opening in November 2025
02Facility power: 40 MW
03IT Load 26MW

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

Based on the announcement at the time of opening, facility power (40 MW) and IT load (26 MW) are distinguished. These figures do not represent current usage, remaining lease capacity, or expansion limits. Addresses and floor space are subject to further verification.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel