Check PNU, Land Use, and Maximum Allowable Building Size
PHYSICAL SITE DUE DILIGENCE
Chuncheon Water-Heat Energy Shinsegae Consortium AI Data Center
Water-Heat Energy Convergence Cluster, Jinae-ri, Dong-myeon, Chuncheon-si, Gangwon Special Self-Governing Province (specific lots to be determined)Detailed Review of Physical Sites and Power Supply
Cross-check against the master records for permits, construction starts, and occupancy permits
Straight-line distance from publicly disclosed substations within a 15-km radius
Save search results and tasks for improvement
