● Operations

NHN Cloud Gwangju National AI Data Center

Oryong-dong, Buk-gu, Gwangju Metropolitan City, Cheomdan 3 District

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

2023년 서비스 개시

Public PowerUndisclosed

Distinguish between power supply, UPS, and IT load

Facility scale연산 88.5PF·저장 107PB

Public and AI-Specialized

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

CENTER OVERVIEW

About the Center

국가 AI 집적단지의 연구·산업 수요를 지원하는 광주 AI 인프라 거점입니다.

01연산 88.5PF
02저장 107PB
03국가 AI 집적단지

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

연산성능(PF)과 저장용량(PB)은 전력용량이 아닙니다. 공개 성능과 전력을 서로 환산하지 않았습니다.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel