2023년 서비스 개시
NHN Cloud Gwangju National AI Data Center
Oryong-dong, Buk-gu, Gwangju Metropolitan City, Cheomdan 3 District
Distinguish between power supply, UPS, and IT load
Public and AI-Specialized
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
국가 AI 집적단지의 연구·산업 수요를 지원하는 광주 AI 인프라 거점입니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
연산성능(PF)과 저장용량(PB)은 전력용량이 아닙니다. 공개 성능과 전력을 서로 환산하지 않았습니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
