AIDC KOREA · Product specifications and public price reference · 2026-10-08
Custom QuoteSTTGDC · STT Seoul 1 상면 / 대규모 임대
Public data checked 2026-10-08 · price and availability verified separately
Request quote
- Electricity
- 시설 전체 최대 IT 부하 30MW
- Network
- Confirm separate terms
- Space
- Confirm product terms
- Equipment capacity
- Subject to equipment specifications
- IP
- Confirm terms
- Setup fee
- Confirm terms
- Contract term
- Confirm at contract
- Energy and excess usage
- Confirm at contract
2026-06 개장 발표; 개별 랙전력·판매가능 용량은 별도 견적
Brochures and data room
Save this page as a PDF for a public brochure. Request supplier technical documents and private transaction materials through consultation.
Price observation history
Records use the verification date. Different power and network configurations are retained as separate observations.
| Date Verified | Published amount · original KRW | VAT | Record category |
|---|
