← AI-DC WebtoonEPISODE 12 · 2026.09.12

PUE 1.3,
How much more electricity will be needed?

Multiplying PUE by the IT load provides a quick estimate of the facility’s initial power consumption. However, since PUE represents the energy ratio over a specific period, the actual power capacity must be verified separately for peak conditions under worst-case outdoor conditions, as well as for design margins and fault operation scenarios.

1 cut. AI-DC KOREA 웹툰 12화: PUE 1.3이면 전력이 얼마나 더 필요한지 설명하는 표지
1 / 10 · AI-DC KOREA Webtoon Episode 12: Cover illustrating how much additional power is required with a PUE of 1.3
2 cut. 시설 전체 에너지를 IT 장비 에너지로 나누는 PUE 공식
2 / 10 · The PUE formula, which calculates the PUE by dividing the total facility energy consumption by the energy consumed by IT equipment
3 cut. IT Load 40MW에 PUE 1.3을 적용한 시설부하 52MW 계산
3 / 10 · Facility load calculated as 52 MW by applying a PUE of 1.3 to an IT load of 40 MW
4 cut. 냉각·전력손실·팬·펌프·조명·제어로 구성되는 부대부하
4 / 10 · Ancillary load consisting of cooling, power losses, fans, pumps, lighting, and controls
5 cut. 연간 PUE 에너지 비율과 여름 피크 수요전력의 차이
5 / 10 · The difference between the annual PUE energy ratio and summer peak power demand
6 cut. 수전 80MW와 PUE 1.3으로 환산한 이론적 IT Load 61.5MW
6 / 10 · Theoretical IT load of 61.5 MW, calculated based on 80 MW of power intake and a PUE of 1.3
7 cut. PUE와 별도로 적용하는 프로젝트별 설계여유 예시
7 / 10 · Examples of project-specific design margins applied separately from PUE
8 cut. N+1·2N 명판 합계와 실제 동시수요·단일고장 운전상태의 차이
8 / 10 · Difference between the total N+1 and 2N nameplate capacities and the actual simultaneous demand and single-fault operating conditions
9 cut. PUE 측정 경계·측정점·기간과 현장발전 처리
9 / 10 · PUE Measurement Boundaries, Measurement Points, Time Periods, and On-Site Power Generation Handling
10 cut. IT Load·경계·피크·이중화·여유·계약전력 체크리스트
10 / 10 · IT Load, Boundary, Peak, Redundancy, Margin, and Contracted Power Checklist
Key Points

While PUE reflects average efficiency, power contracts must be able to handle peak MW loads.

PUE = Total energy consumption of the data center facility ÷ Energy consumption of IT equipmentThe numerator and denominator must use the same measurement period and consistent boundaries, and the theoretical minimum is 1.0. A PUE of 1.3 means that for every unit of energy used by IT, a total of 1.3 units is consumed when accounting for auxiliary facility equipment such as cooling, power conversion, fans, pumps, lighting, and controls.

In the initial plan, applying a PUE of 1.3 to an IT load of 40 MW results in a total facility load of 40MW × 1.3 = 52MWThis is converted as follows. In this case, the ancillary load excluding IT is 52 MW – 40 MW = 12MWThat is correct. However, considering that PUE is essentially an energy efficiency ratio, this MW conversion is a conceptual verification based on the assumption that the design PUE holds true at that operating point as well.

The 12 MW of ancillary load is distributed among chillers and heat sinks, UPS, transformers, and power distribution losses, as well as fans, pumps, lighting, security, and control systems. Since the proportion of each item varies depending on the cooling method, outdoor air conditions, IT load factor, equipment efficiency, and operating mode, we do not allocate them using a fixed ratio but instead verify them using load tables for each piece of equipment and time-of-day operating sequences.

There is no guarantee that the annual PUE of 1.3 will remain exactly 1.3 even during peak summer load moments. At low loads, the PUE may worsen due to fixed ancillary loads, and during heat waves, power consumption for cooling, fans, and pumps may increase. Therefore, the capacity of power intake, transformers, generators, and power distribution systems Worst-case outdoor air conditions, maximum concurrent IT load, partial-load efficiency, equipment degradation, and startup/shutdown sequencesWe verify this using a peak kW/MW load table that reflects this information.

Conversely, if the available facility power is 80 MW, the theoretical IT limit when applying a PUE of 1.3 is 80 MW ÷ 1.3 = approximately 61.5 MWThis is the upper limit converted value before reflecting the reserve margin and grid/equipment constraints; it does not mean that “80 MW of power supply = 80 MW of IT load.”

Design margins should be shown separately from PUE to avoid double counting. For example, applying a 10% design margin to 52 MW results in 57.2 MW. Under the same assumptions, the IT load that can be accommodated within an 80 MW facility limit is 80 ÷ (1.3 × 1.10) = approximately 55.9 MWThe 10% figure is an illustrative assumption; the actual reserve rate is determined based on the operator’s reliability targets, grid coordination, design standards, and phased expansion plans.

Simply adding up the ratings on the nameplates of equipment in an N+1 or 2N configuration may result in an overestimation of power demand. You must calculate the simultaneous demand during normal operation, the standby and test-run loads of spare equipment, and the maximum load on the surviving path in the event of a single failure, respectively. Conversely, if you overlook conditions where the load is concentrated on a single path during maintenance or a failure, the design will be under-dimensioned.

The measurement scope is also critical for PUE comparisons. Even for the same facility, different values will result if the total energy at the facility’s point of entry, the IT measurement point, time synchronization, or the treatment of on-site generation and unmetered energy differ. Apply the measurement and reporting principles of ISO/IEC 30134-2, and record the measurement scope, period, load factor, and outdoor air conditions along with the PUE values in project documentation.

※ This content is intended for preliminary review during the early stages of the project. The figures 40 MW, PUE 1.3, 80 MW, and a 10% margin are examples used to illustrate the calculation structure. The final contracted power and installed capacity must be finalized based on hourly load profiles, grid coordination, electrical and mechanical designs, equipment manufacturer data, and operating conditions.

Start a site analysis that includes PUE and peak load →
Technical Reference Materials

Please refer to the original text for the definition of PUE and its measurement boundaries.

ISO/IEC 30134-2:2026 — Power Usage Effectiveness ↗

The Green Grid: Definition of PUE ↗

U.S. Department of Energy FEMP: Calculating the PUE for Annual Facility Energy and IT Energy ↗

Start a consultation · Choose a channel