POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동서울#2-강남 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-c607a33900f0c934c1dbdefa
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7eade55c972417f5
stable_project_keyprjtDef:234237:ESB
project_definition234237
first_region_codeESB
manual_source_formatfalse
project_name154kV 동서울#2-강남 전력구 건설사업
project_name_list서울 동남권지역 전기공급시설 전력구공사 (동서울#2-강남 1차)
purpose강남 변전소 신설에 따른 계통 보강
project_region_detail서울특별시 송파구
project_period_raw2019.12~2027.10
project_scale_rawL=9,508M(터널 5,918M, NATM 117M, 전력구 3,473M)
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c28e37d5f0ddffaf
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7eade55c972417f5

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7eade55c972417f5

Sources EV-c607a33900f0c934c1dbdefa
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 abac345529340e410e25bc2c4db2c7bf50c60dcc2c55dc1fc59015296fbb2204
Source schedule candidates · KOR · kepco_planned

154kV 동서울#2-강남 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234237|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c28e37d5f0ddffaf

Sources EV-c4cf53b3085312a09b206083
Evidence SHA-256 d5f172346775f040e8c9d32df1866a7d6edbf0be394da226caf7bf429f8cb028
행 SHA-256 e57a7536afe73a88b41ee2ff0242d6abd84ad3eed36c404d367e3e37ec62d37b
Source schedule candidates · KOR · kepco_planned

154kV 동서울#2-강남 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2019-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234237|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c28e37d5f0ddffaf

Sources EV-c4cf53b3085312a09b206083
Evidence SHA-256 d5f172346775f040e8c9d32df1866a7d6edbf0be394da226caf7bf429f8cb028
행 SHA-256 e57a7536afe73a88b41ee2ff0242d6abd84ad3eed36c404d367e3e37ec62d37b
Source snapshots by date · KOR · kepco_planned

154kV 동서울#2-강남 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c28e37d5f0ddffaf
stable_project_idkproj_7eade55c972417f5
source_key202609|234237|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list서울 동남권지역 전기공급시설 전력구공사 (동서울#2-강남 1차)
project_name_detail154kV 동서울#2-강남 전력구 건설사업
region_summary_raw서울특별시 송파구등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 강남 변전소 신설에 따른 계통 보강
Project region
  • 서울특별시 송파구
Project period
  • 2019.12~2027.10
사업 규모
  • L=9,508M(터널 5,918M, NATM 117M, 전력구 3,473M)
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2015.12 ~ 2018.10 기본설계: 2015.12 ~ 2018.10 실시설계: 2015.12 ~ 2018.10 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2019.12 공사 기간: 2019.12 ~ 2028.08 감독자: [redacted], 실적): 99, 88
ㅇ‘19.12 : 공사착수 ㅇ‘20.02~‘21.04 : 공사중지 ㅇ‘21.06~‘21.10 : 부분공사중지 ㅇ‘22.03 : 수직구 가시설, 방음하우스 설치완료 ㅇ‘23.06 : 수직구#1 굴착완료 ㅇ‘24.03 : 수직구#2 굴착완료 ㅇ‘25.12 : 터널1구간 Shield TBM 굴진완료 ㅇ‘26.09 : 터널2구간 Shield TBM 굴진완료 ㅇ‘26.01~28.03 : NATM 터널굴착 및 구조물 시공예정 ㅇ‘28.08 : 공사준공 예정
future_plan_redacted□ 향후계획 ㅇ‘19.12 : 공사착수 ㅇ‘20.02~‘21.04 : 공사중지 ㅇ‘21.06~‘21.10 : 부분공사중지 ㅇ‘22.03 : 수직구 가시설, 방음하우스 설치완료 ㅇ‘23.06 : 수직구#1 굴착완료 ㅇ‘24.03 : 수직구#2 굴착완료 ㅇ‘25.12 : 터널1구간 Shield TBM 굴진완료 ㅇ‘26.09 : 터널2구간 Shield TBM 굴진완료 ㅇ‘26.01~28.03 : NATM 터널굴착 및 구조물 시공예정 ㅇ‘28.08 : 공사준공 예정
attachment_count0
source_detail_sha256d5f172346775f040e8c9d32df1866a7d6edbf0be394da226caf7bf429f8cb028
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234237|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c28e37d5f0ddffaf

Sources EV-c4cf53b3085312a09b206083
Evidence SHA-256 d5f172346775f040e8c9d32df1866a7d6edbf0be394da226caf7bf429f8cb028
행 SHA-256 e57a7536afe73a88b41ee2ff0242d6abd84ad3eed36c404d367e3e37ec62d37b
Source snapshots by date · KOR · kepco_planned

154kV 동서울#2-강남 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7eade55c972417f5
stable_project_keyprjtDef:234237:ESB
project_definition234237
first_region_codeESB
manual_source_formatfalse
project_name154kV 동서울#2-강남 전력구 건설사업
project_name_list서울 동남권지역 전기공급시설 전력구공사 (동서울#2-강남 1차)
purpose강남 변전소 신설에 따른 계통 보강
project_region_detail서울특별시 송파구
project_period_raw2019.12~2027.10
project_scale_rawL=9,508M(터널 5,918M, NATM 117M, 전력구 3,473M)
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c28e37d5f0ddffaf
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7eade55c972417f5

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7eade55c972417f5

Sources EV-c607a33900f0c934c1dbdefa
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 abac345529340e410e25bc2c4db2c7bf50c60dcc2c55dc1fc59015296fbb2204

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel