POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 11items · current page 1–11 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-49b49a72de14dcb6ccf39a49
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_13a06de61418f7d5
stable_project_keyprjtDef:234435:ESB
project_definition234435
first_region_codeESB
manual_source_formatfalse
project_name154kV 기지분기 전력구 건설사업
project_name_list평택지역 전기공급시설 전력구공사(기지분기)
purpose오산미군기지 신규부하 공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2024.07~2032.10
project_scale_raw개착식 전력구 367M, SHIELD TBM 1,440M
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e448569faa1e3094
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_13a06de61418f7d5

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_13a06de61418f7d5

Sources EV-49b49a72de14dcb6ccf39a49
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 aeeba67b59edfce39bd2e06da00791e9a019d4305b34816c4c28ebcd7c963fb6
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source schedule candidates · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234435|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source snapshots by date · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e448569faa1e3094
stable_project_idkproj_13a06de61418f7d5
source_key202609|234435|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list평택지역 전기공급시설 전력구공사(기지분기)
project_name_detail154kV 기지분기 전력구 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 오산미군기지 신규부하 공급
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2024.07~2032.10
사업 규모
  • 개착식 전력구 367M, SHIELD TBM 1,440M
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2025.07 ~ 2027.02 기본설계: 2025.07 ~ 2026.02 실시설계: 2026.03 ~ 2027.02 설계담당자: [redacted]
□ '24. 7 : 현장답사 분석보고 □ '25. 7 : 설계용역 착수 □ '26. 2 : 기본설계 심의 □ '26. 9 : 실시설계 진행중
future_plan_redacted□ 향후계획 □ '24. 7 : 현장답사 분석보고 □ '25. 7 : 설계용역 착수 □ '26. 2 : 기본설계 심의 □ '26. 9 : 실시설계 진행중
attachment_count0
source_detail_sha25687901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234435|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e448569faa1e3094

Sources EV-dfb96467a73b6b21d8fc0f5b
Evidence SHA-256 87901d3e16363db352f35f430cc074d0a5822fe8c6f9fb0406ec464fe93570da
행 SHA-256 31786c128414c540dffc852fdbac0942e1fe1f2f1ee8ca373b84e82001b76cd8
Source snapshots by date · KOR · kepco_planned

154kV 기지분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_13a06de61418f7d5
stable_project_keyprjtDef:234435:ESB
project_definition234435
first_region_codeESB
manual_source_formatfalse
project_name154kV 기지분기 전력구 건설사업
project_name_list평택지역 전기공급시설 전력구공사(기지분기)
purpose오산미군기지 신규부하 공급
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2024.07~2032.10
project_scale_raw개착식 전력구 367M, SHIELD TBM 1,440M
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e448569faa1e3094
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_13a06de61418f7d5

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_13a06de61418f7d5

Sources EV-49b49a72de14dcb6ccf39a49
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 aeeba67b59edfce39bd2e06da00791e9a019d4305b34816c4c28ebcd7c963fb6

AI-DC KOREA MEMBER