POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · USA · primary:236161de785217b1d1ab6a53

Sweetwater 2 campus, Texas / contracted_grid_connection_capacity

Not obtained · Source-stated

Relationship status: Source-stated · contract applies to inherited subject
Related record r1:power_source:236161de7852:power_asset:53b40c1444c3 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idpower:contract:P008
to_kindpower_object
to_idr1:power_source:236161de7852:power_asset:53b40c1444c3
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
irisenergy.gcs-web.com ↗

Data Source 2025-03-17 · Retrieved Unverified

irisenergy.gcs-web.com

Source location inherited observation P008

Sources EV-4ed4e6d89879864b60b05871
Evidence SHA-256 f70420e5f2ae99cb7db8393fbebe03a59727b20187d959aec62ab51ab1dd090a · inherited_normalized_file
Power assets and projects · USA · primary:236161de785217b1d1ab6a53

Sweetwater 2 campus, Texas / contracted_grid_connection_capacity

Undisclosed · Published statement

Metric or conditionSource valueBasis, scope and stage
contracted_grid_connection_capacity600 MWcontracted grid connection capacity · Undisclosed · as published
As-of date 2025-03-17
Sources EV-4ed4e6d89879864b60b05871
Detailed source fields
Original source fieldPublished value or condition
Contracting parties
    contract_details
    source_record_idcontract:P008

    Location: Coordinates not obtained · no map marker

    Sources, reference dates and retrieval dates 1items
    irisenergy.gcs-web.com ↗

    Data Source 2025-03-17 · Retrieved Unverified

    irisenergy.gcs-web.com

    Source location inherited observation P008

    Sources EV-4ed4e6d89879864b60b05871
    Evidence SHA-256 f70420e5f2ae99cb7db8393fbebe03a59727b20187d959aec62ab51ab1dd090a · inherited_normalized_file
    Power observations · USA · primary:236161de785217b1d1ab6a53

    Sweetwater 2 campus, Texas / contracted_grid_connection_capacity

    Undisclosed · Official statement

    Metric or conditionSource valueBasis, scope and stage
    contracted_grid_connection_capacity600 MWcontracted grid connection capacity · Undisclosed · as published
    As-of date 2025-03-17
    Sources EV-4ed4e6d89879864b60b05871
    Detailed source fields
    Original source fieldPublished value or condition
    inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
    eligible_for_exact_contract_mwtrue
    Verification statusprimary_statement
    Change typereused
    Contracting parties

      Signed connection capacity is explicit. A 2026-09-08 operator update says the two Sweetwater campuses are conditionally included in ERCOT Batch Zero as Base Load, with ongoing approvals. Contract existence does not prove current unrestricted delivery.

      Sources, reference dates and retrieval dates 1items
      irisenergy.gcs-web.com ↗

      Data Source 2025-03-17 · Retrieved Unverified

      irisenergy.gcs-web.com

      Source location inherited observation P008

      Sources EV-4ed4e6d89879864b60b05871
      Evidence SHA-256 f70420e5f2ae99cb7db8393fbebe03a59727b20187d959aec62ab51ab1dd090a · inherited_normalized_file

      AI-DC KOREA MEMBER

      Log In

      Sign in to continue on this page.

      G Continue with GoogleK Continue with Kakao

      Choose the Google or Kakao account you registered with.

      Start a consultation · Choose a channel